About Us

In March 2006, Star-Lite Construction Ltd. was created to continue the building of homes in both Star-Lite Village and Eaglewood Village as well as in Fredericton and its surrounding area.

In addition to new home construction, Star-Lite Construction Ltd. will also provide the service of renovations for both residential and small commercial projects. We also provide homes for the environmentally sensitive. Our homes can be R2000 certified and/or EnerGuide rated.

Complete Land/Home Package Available in StarLite Village Subdivision, Eaglewood Village Subdivision and Eagle Ridge Subdivision.  Featuring spacious private one acre plus treed building lots, Restrictive Covenants to protect your investment.  Only minutes from Fredericton.Star-Lite Construction Ltd. is a certified builder for:

 

Energy Efficiency/Cost Analysis by Heat Seal Limited
Heat Seal Limited – Home Performance Experts
161 Casey Street, P.O. Box 7276, St. John’s, NF, A1E 3Y5

Spec Home – Lot 205 Star-Lite Village

Standard P-File v/s R-2000 v/s Star-Lite Home

Characteristic Standard P-File R-2000 Star-Lite Cost
File Name Base File R2K 5700RB01540017 $2,000.00
Ceiling Insulation R-40 R-50 R-52
Truss – Increase Hell 8″ 1′ 12″
Main Walls R-20 R-20 R-20
Basement Walls R-12 R-22 R-22
Basement Slab R-0 R-0 R-??
Headers R-20 R-40 R-30
Exposed Floors R-20 R-32 R-32
Windows Double Glazed LEA LEA
Ventilation Counstructo Counstructo Mid Eff. HRV
Lighting Standard Standard Energy Efficient
Domestic Hot Water Standard Converver Solar & Conserver
Air Leakage 4.5 ach@50 1.5 ach@50 1.0 ach@50
Air Leakage Testing N/A Yes
Inspections N/A Yes
Enrollement Fee N/A Yes
Plan Evaluation N/A Yes
File Administration N/A Yes
Grant
Annual Greenhouse Gas Emissions 25,010 14,750 12,250
Annual Energy Cost $4,774.16 $3,073.90 $2,679.92
Energuide Rating 67 80 84
Total Cost @2,000.00

Summary: R-2000 to Star-Lite

Additional Cost $2,000.00
Simple Payback in Years 5.08

Energy Cash Flow Analysis

Monthly Energy Savings $32.83
Annual Energy Saving $393.98
Return on Investment 19.70%
Mortgage Interest Rate 7.3%
Increased Monthly Payment $14.46
Result:

  • A positive Monthly Energy Cash Flow of $18.38
  • An annual Reduction in Greenhouse Gas Emissions of 2500 kg/year